Grid connection services
Grid connection is not optional for larger arrays. BlankSolar prepares technical data, submits notifications to your distribution network operator, and keeps you informed until energisation is confirmed.

Grid connection & DNO services
Connecting solar to the UK grid requires correct notification or application to your distribution network operator (DNO). BlankSolar identifies whether your system needs G98 notification or G99 approval and submits technical data on your behalf.
We track responses, advise on export limits, and plan install dates around approvals where energisation must wait. Commercial and three-phase sites receive the same structured approach with longer lead times flagged early.
Proper grid paperwork protects you legally and ensures SEG and warranty requirements stay aligned with an authorised connection.
- G98 and G99 handled in-house
- Export limiting configured on inverters
- Timelines explained per network operator
- Documentation for SEG and handover
Compliant connection
Required for larger arrays and many battery installs.

Applications
Correct G98 (notify) or G99 (apply) routes for your kW and supply type. Forms include inverter details and installation address.

Export limits
Where DNO requires export curtailment, we configure inverter limits and explain impact on annual yield.

Commercial
Three-phase and larger sites receive dedicated project management — longer lead times are flagged early.
Connection process
We keep you informed at each stage.
Notification
We identify whether your system is notify-only or needs formal approval before install proceeds.
Notification
We identify whether your system is notify-only or needs formal approval before install proceeds.
Often combined with
Services customers usually pair with this one.

Solar Panel Installation
Complete rooftop PV installation for homes and businesses — MCS-certified workmanship, quality panels and inverters, and full commissioning with export guidance.
View service
Battery Storage Installation
Home and commercial battery installs — paired with new solar or retrofitted to existing PV, using Fox ESS, GivEnergy, and other trusted brands with full commissioning.
View service
Solar Inverter Installation
Supply and install string, hybrid, and micro-inverters — sized for your array, grid connection, and any battery plans.
View service
Commercial & Ground-Mounted Solar
Larger rooftop, flat-roof and ground-mounted systems for businesses, farms and landlords — designed around your load profile, roof structure and grid capacity.
View serviceGrid Connection Services across Essex
We are based in Braintree and cover 81 towns and villages across all 14 Essex districts, with UK-wide projects by arrangement. Pick your district for local planning, grid and travel notes.
Grid Connection Services — common questions
Quick answers about this service. Contact us for property-specific advice.
Guides worth reading first
Plain-English explainers from our blog.

Export
Smart Export Guarantee, explained
The Smart Export Guarantee pays you for surplus electricity you send to the grid. Here is how it works, and why the paperwork from your installer matters.

MCS
What MCS certification means
MCS is the UK quality scheme most often required for export tariffs and many incentive applications. Here is what it covers, and what you should receive at handover.

Installation
What to expect on install day
A typical home installation is planned around scaffolding, roof work, and electrical commissioning. Here is how the day usually runs.
Ready to go solar?
Book a free survey or speak to our MCS-certified team about your property.